A power failure in a hospital is a disaster scenario that requires quick and structured action. The necessary steps are learnt in this micro grid scenario.
Starting from observation of the automated sequence, students learn which actions are necessary and in which order to ensure a stable emergency power supply. The different phases, commissioning the emergency power supply and restoring normal operation, are then carried out by the students themselves.
Our didactic CASSY SCADA serves as the interface for controlling the scenario.
Individual steps, such as running up the generator, can be optimised in terms of time to ensure an even faster supply.
In the free scenario, what has been learnt can be applied, and mistakes are allowed.
Tasks in the scenario
- Blackout detection
- Provision of the emergency power supply
- Minimisation of the power failure duration
- Supplying the hospital with a variable load demand
- Reconnecting the hospital to the public grid (synchronisation)